2025-05-30 00:00:00
浏览:
The operation of Tianjin die-casting molds can be divided into the following steps:
1. Mold installation. Place the properly fitted core and pattern on the base plate, and place a cushion block (or knock in a small wooden wedge) between the base plate and the lower template to ensure that the upper and lower gaps meet the specifications
Set requirements, be flat, uniform and consistent; Then place the other half of the processed integer inclined surface facing upwards on the end face of the sample for assembly and positioning and pressing work
——This is a necessary measure to ensure accurate thickness of the formed parts and the same shape of each part. (Pay attention to distinguishing between the positive and negative sides). Secure the surroundings with screws
The border position and installation of attachments can complete this operation process.